Darłowo: Planning of the ferry terminal proceeds

First renderings of the new building

13.04.2012


The realisation of the new ferry terminal in Darłowo / PL moves forward according to the schedule. The investment is an important element of improving the transport chain for passengers travelling from Darłowo to Nexø / Bornholm.

In Jan 2012, the architect office NOWA BRAMA from Słupsk was subcontracted for the elaboration of the technical documentation for the new terminal. The concept of the building took advantage of inspirations and lessons learned that were collected during the INTERFACE PLUS study trip to Sweden and Denmark in May 2011. The design process is to be finalised by the end of May 2012. The construction of the terminal is expected to start in Sept / Oct 2012.

The new facility will be located on the western side of the port. It is designed as two storey building with entrances from both the land side and the quay side. Please click on the following link to see first renderings of the passenger terminal building in Darłowo.